CV

賴鵬仁 Peng-Jen Lai

laibird@mail.nknu.edu.tw
Kaohsiung, Taiwan, , TW

Summary

國立高雄師範大學數學系賴鵬仁教授,專精於幾何學、柔性計算和數學探索與程式設計工具

Education

  • 數學系
    1997-07
    德國魯爾大學
  • 數學系
    1989-06
    國立清華大學
  • 數學系
    1987-06
    國立清華大學

Work Experience

  • 教授
    2013-03 - present
    國立高雄師範大學理學院數學系
    Professor of Mathematics
  • 副教授
    2013-01 - 2013-03
    國立高雄師範大學數學系
    Associate Professor of Mathematics
  • 副教授
    2009-09 - 2013-01
    國立高雄師範大學數學系
    Associate Professor of Mathematics
  • 助理教授
    1998-02 - 2009-09
    國立高雄師範大學
    Assistant Professor of Mathematics
  • 助教
    1992-08 - 1994-10
    國立高雄師範大學
    Teaching Assistant
  • 專任總助教
    1991-08 - 1992-07
    國立清華大學數學系
    Full-time Chief Teaching Assistant

Skills

Mathematics

  • Geometry 幾何學
  • Soft computing 柔性計算
  • Exploring Mathematics with Shareware 以自由軟體探索數學
  • 數理邏輯益智遊戲與人工智能

Programming Languages

  • Python
  • JavaScript
  • C
  • R

Mathematical Software

  • GeoGebra
  • Matlab
  • Maple

Publications

  • Using heuristic algorithms to solve the scheduling problems with job-dependent and machine-dependent learning effects
    2015
    Journal of Intelligent Manufacturing
    Volume 26, Issue 4, pp 691-701
  • A note on single-machine scheduling with sum-of-processing-time-based learning and forgetting effects
    2015
    Applied Mathematical Modelling
    Co-authored with Chia-Huang Wu and Wen-Chiung Lee
  • Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects
    2014
    Information Sciences
    Volume 269, Pages 142–158
  • Single-machine scheduling with accelerating deterioration effects
    2014
    Optimization Letters
    Volume 8, Issue 2, pp 543-554
  • Single-machine scheduling with learning and forgetting effects
    2013
    Applied Mathematical Modelling
    Volume 37, Issue 6, Pages 4509–4516
  • Single-machine scheduling with a logarithm deterioration function
    2012
    Optimization Letters
    Volume 6, Issue 8, Pages 1719-1730
  • Modified Genetic Algorithms for Solving Fuzzy Flow Shop Scheduling Problems and Their Implementation with CUDA
    2012
    Expert Systems with Applications
    Volume 39, Pages 4999–5005
  • Single-machine scheduling with a nonlinear deterioration function
    2010
    Information Processing Letters
    Volume 110, Issue 11, Pages 455-459
  • How to make fractal tilings and fractal reptiles
    2009
    Fractals
    Volume 17, Issue 4, Pages 493-504
  • Using ant colony optimization to minimize the fuzzy makespan and total weighted fuzzy completion time in flow shop scheduling problems
    2009
    International Journal of Uncertainty, Fuzziness and Knowledge-based Systems
    Volume 17, No. 4, Pages 559-584
  • Concise methods to generate fractal tilings
    2009
    International Journal of Nonlinear Sciences and Numerical Simulation
    No. 10(5), Pages 585-594
  • Single-machine scheduling with sum-of-logarithm-processing-times-based learning considerations
    2009
    Information Sciences
    Volume 179, Pages 2416–2425
  • A Comparative Study of the Monitoring Performance for Weighted Control Charts
    2009
    Journal of Statistics and Management Systems
    Volume 12, No. 2, Pages 207-228
  • Using Genetic Algorithms to Solve Fuzzy Flow Shop Scheduling Problems Based on Possibility and Necessity Measures
    2008
    International Journal of Uncertainty, Fuzziness and Knowledge-based Systems
    Volume 16, No. 3, Pages 409-433

Presentations

  • Your Talk Title 1
    2024
    Conference or Institution Name
    Location, Country
  • Your Talk Title 2
    2023
    Conference or Institution Name
    Location, Country

Teaching

  • 碎形幾何 / Fractal Geometry
    2025
    國立高雄師範大學數學系
    Role: 研究所課程 (114學年度)
    碎形幾何理論、碎形鑲嵌構造方法、數學軟體應用
  • 動態幾何 / Dynamical Geometry
    2025
    國立高雄師範大學數學系
    Role: 研究所課程 (114學年度)
    動態幾何理論、GeoGebra應用、數位化教學設計
  • 電子計算機在教學及研究上之應用 / Computer Application in Instruction Research
    2025
    國立高雄師範大學數學系
    Role: 研究所課程 (114學年度)
    程式設計、數學軟體應用、教育科技創新

Portfolio

  • Your Project 1
    2024
    Portfolio
    Brief description of your project